Likely sponsor. The posting does not mention visas, but this employer had H-1B petitions approved by USCIS in the last two years and filed LCAs for similar roles.

Principal Data Center Construction Manager — H-1B visa sponsorship

Abilene, TX

$102.3K–$209.5K a year

Visa snapshot

Likely H-1B sponsor: has H-1B approvals in public USCIS data. The posting does not mention visa sponsorship.

Sponsorship
Likely sponsor. The posting does not mention visas, but this employer had H-1B petitions approved by USCIS in the last two years and filed LCAs for similar roles.
Source: USCIS & DOL public data. The posting does not mention visas, but this employer had H-1B petitions approved by USCIS in the last two years and filed LCAs for similar roles.
Employer's H-1B approvals
2,300 in FY2026
99% of petitions approved
LCA median wage, similar roles
$131.1K
From 9 certified LCAs for similar titles
Cap-exempt employer
No
Subject to the yearly H-1B lottery for new visas
Salary in the posting
$102.3K–$209.5K a year
Active sponsor
Yes
Had H-1B approvals in the latest USCIS year

Likely sponsor

Quick Summary

Requirements Summary

5+ years of experience supporting construction execution on large-scale, complex projects. Experience in data

Technical Tools
Construction ManagerConstruction & Real Estate

ABOUT THE ROLE:
Principal Data Center Construction Management
Oracle Cloud Infrastructure (OCI) — Data Center Infrastructure
Organization: OCI Hyperscale Data Center Delivery
Location: Shackelford, Texas/Abilene, Texas

 

Requirements

~3 min read

 

  • 5+ years of experience supporting construction execution on large-scale, complex projects.
  • Experience in data centers, mission-critical facilities, industrial construction, infrastructure, semiconductor, power, or other technical construction environments.
  • Knowledge of construction sequencing, field coordination, manpower tracking, productivity monitoring, and milestone execution.
  • Ability to read and interpret construction drawings, specifications, schedules, look-ahead plans, and turnover documentation.
  • Proven ability to identify field risks, resolve construction issues, and escalate effectively.
  • Strong understanding of safety expectations, quality standards, punch-list management, and turnover readiness.
  • Excellent communication skills with the ability to provide clear, concise updates.
  • Ability to work primarily onsite with approximately 85–95% field/site engagement.
  • Strong ownership mindset, urgency, and the ability to operate in a fast-paced construction environment.

 

  • Experience supporting hyperscale data center construction projects.
  • Experience in an owner’s representative, construction management, EPC, or general contractor environment.
  • Familiarity with data center systems, including electrical, mechanical, controls, civil, structural, architectural, network, or commissioning-related scopes.
  • Experience supporting or coaching Construction Managers, field engineers, coordinators, or discipline-specific construction teams.
  • Experience supporting fast-track construction, phased turnover, commissioning-driven delivery, or recovery execution.
  • Familiarity with construction reporting tools, scheduling platforms, document control systems, and issue tracking processes such as Primavera P6, Oracle Primavera Cloud, MS Project, Power BI, Tableau, Smartsheet, or similar tools.
  • Strong ability to drive contractor accountability while maintaining productive working relationships.
  • Ability to contribute through field presence, direct communication, disciplined follow-up, and practical problem solving.
  • Certifications such as PMP, PgMP, PMI-SP, CCP, PSP, or Lean Six Sigma.
 
#LI-LD1
 
Disclaimer:

Certain U.S. based or U.S. customer or client-facing roles may be required to comply with applicable requirements, such as immunization/occupational health mandates, and/or drug testing requirements.

Range and benefit information provided in this posting are specific to the stated locations only

US: Hiring Range in USD from: $102,300 to $209,500 per annum. May be eligible for bonus and equity.


Oracle maintains broad salary ranges for its roles in order to account for variations in knowledge, skills, experience, market conditions and locations, as well as reflect Oracle's differing products, industries and lines of business.
Candidates are typically placed into the range based on the preceding factors as well as internal peer equity.

Oracle US offers a comprehensive benefits package which includes the following:
1. Medical, dental, and vision insurance, including expert medical opinion
2. Short term disability and long term disability
3. Life insurance and AD&D
4. Supplemental life insurance (Employee/Spouse/Child)
5. Health care and dependent care Flexible Spending Accounts
6. Pre-tax commuter and parking benefits
7. 401(k) Savings and Investment Plan with company match
8. Paid time off: Flexible Vacation is provided to all eligible employees assigned to a salaried (non-overtime eligible) position. Accrued Vacation is provided to all other employees eligible for vacation benefits. For employees working at least 35 hours per week, the vacation accrual rate is 13 days annually for the first three years of employment and 18 days annually for subsequent years of employment. Vacation accrual is prorated for employees working between 20 and 34 hours per week. Employees working fewer than 20 hours per week are not eligible for vacation.
9. 11 paid holidays
10. Paid sick leave: 72 hours of paid sick leave upon date of hire. Refreshes each calendar year. Unused balance will carry over each year up to a maximum cap of 112 hours.
11. Paid parental leave
12. Adoption assistance
13. Employee Stock Purchase Plan
14. Financial planning and group legal
15. Voluntary benefits including auto, homeowner and pet insurance

The role will generally accept applications for at least three calendar days from the posting date or as long as the job remains posted.

Career Level - IC4


H-1B rules to know right now

Last updated Nov 27, 2026

Current H-1B rules

$100,000 fee on new H-1B petitions. A September 2025 proclamation added the fee for new petitions for people outside the US. Changes of status inside the US (for example F-1 to H-1B), extensions and employer changes were not covered. Federal courts have blocked the fee, and USCIS is not collecting it right now. Litigation continues.

Wage-weighted lottery. From the FY2027 registration (March 2026) the H-1B lottery gives more entries to higher wage levels (Level I = 1 entry, Level II = 2, and so on).

Cap-exempt employers. Universities, their affiliated nonprofits and nonprofit research organizations can file H-1B petitions at any time of year, outside the lottery.

Sponsorship information comes from the job posting or from public USCIS and DOL data. It is not a guarantee of visa sponsorship and it is not legal advice.

Other H-1B sponsors hiring Construction & Real Estate in Texas

See all
  • USD $51.15 - $97.88 per hour

    Likely sponsor. The posting does not mention visas, but this employer had H-1B petitions approved by USCIS in the last two years and filed LCAs for similar roles.Atlanta, GAOn-site68 Med
  • Likely sponsor. The posting does not mention visas, but this employer had H-1B petitions approved by USCIS in the last two years and filed LCAs for similar roles.Plano, TXOn-site57 Med
  • Likely sponsor. The posting does not mention visas, but this employer had H-1B petitions approved by USCIS in the last two years and filed LCAs for similar roles.Austin, TXOn-site19 Lowest
  • $76,000 — $149,000 USD

    Likely sponsor. The posting does not mention visas, but this employer had H-1B petitions approved by USCIS in the last two years and filed LCAs for similar roles.Atlanta, GAOn-site42 Low